Schraubenspannmaschine für Druckwasserreaktoren, Ausführungsbeispiel PWR-EPR 1600 MW

Multi Stud Tensioner for Pressurised Water Reactors

Stud tensioning, turning and transport in one system

Opening and closing during RPV maintenance

The reactor pressure vessel in nuclear power plants needs to be maintained at intervals of approximately twelve to eighteen months for replacing spent fuel elements by new ones, and to perform the inspections and tests stipulated by the government authorities. The reactor consists of the bottom part, the so-called reactor vessel, and the top part, the reactor cover. Up to 60 studs and nuts distributed at equal intervals on the circumference of the vessel join and press these two parts together. Generally, one of the tasks during the outage work is under special focus; it is the de-tensioning and the re-tensioning of the RPV head.