Activation Calculations for Dismantling
Calculate activation of components and materials for dismantling planning.
Purpose and Application
The dismantling of a nuclear power plant requires precise knowledge of the radioactive inventory of all plant components resulting from decades of operation. However, it is not economical to carry out sampling measurements everywhere in the nuclear facility and for each individual component. Therefore, against the background of safe and economic planning of the dismantling of the plant, exact calculations of the radioactive inventory of all components are essential.
As early as 2009, we developed a new innovative calculation method with the globally recognized 3D simulation software MCNP, which makes it possible to calculate the radioactive inventory of nuclear facilities in the highest level of detail. In addition to the detailed, realistic modelling of the 3D geometry, the entire operational history of the plants is included in the new procedure, along with all the fuel elements used.
Functions and Analysis
Contact: Activation Calculations
Talk to us – we will advise you on Activation calculations and your application.