Logo Maschinen und Anlagenbau

 

Cranes

 

Load transportation – rendered safe

Our services extend from supplying new crane systems for a variety of applications to increasing the capacity of a reactor building crane. Design, pre-inspection documentation, manufacture with partners, installation, commissioning and documentation: Siempelkamp offers you the entire package from a single source.

Refitting measures for increasing the nominal load are carried out in accordance with the specifications of the relevant Nuclear Safety Standards Commission.

Selection of possible refitting measures:

  • Rope compensation


  • Load measurement


  • Reinforcement of crane structure


  • Refitting crane trolley


  • Reinforcement of crane railways
Titel News
17.12.08

Renaming: Wenutec becomes Siempelkamp Tensioning Systems

» more


16.06.08

Siempelkamp at the Annual Meeting on Nuclear Technology 2008

» more


19.05.08

Siempelkamp Nukleartechnik GmbH purchases MOTA Europe Limited

» more


13.12.07

5000th MOSAIK®-Container, a story of success

» more